Thursday, June 23, 2022

SHEFFIELD ON 22 JUNE 2022 - Frank Bagshaw

 

Good to see trams running to Halfway again after the line from Beighton had been closed for engineering work.
Tram  122 at Halfway. At the other terminus is  tram 101 at Malin Bridge.
 


 

Wednesday, June 22, 2022

CRICH - JUNE 21ST, WORK TO SORT OUT THE OVERHEAD, from Frank Bagshaw.

 

CRICH - JUNE 21ST, WORK TO SORT OUT THE OVERHEAD,  from Frank Bagshaw. 

Contractors Pro Trak arrived to remove poles from the depot fan and sort out other wiring issues we needed help with in the street.
Next job is for the Pro Trak Civils team to prepare the depot fan ground for the NET donated poles and concrete bases to be installed. re-wiring the depot fan should follow next week.    
At the same time another contractor started work on the Metropolitan police box (a listed building), blast cleaning then to be repainted. 

Cleaning the Tardis

Extra help at the Museum

Removing a pole